Solutions / Traffic studies and modelling

Traffic studies and traffic modelling

Traffic studies and traffic models show how a road network behaves today and how it would behave after a change — a new junction design, a circulation plan, roadworks or new traffic signals — before anything is built.

Why model before you build?

Infrastructure changes are expensive and difficult to undo. A calibrated model makes the effects of options visible in advance: queues, delays, travel times, route changes, public transport reliability and safety risks. It also helps to explain choices to decision-makers and residents.

Types of traffic models

  • Strategic (macroscopic) models describe a whole region and estimate how many trips are made, where they go, which mode is used and which routes are chosen.
  • Mesoscopic models add the dynamics of congestion over time, for example for evaluating diversions or roadworks over a network.
  • Microscopic models simulate individual vehicles, cyclists and pedestrians, including car-following, lane changing and traffic signals. They are suited for junctions, corridors and roundabouts.

Well-known tools include commercial packages such as PTV Visum and Vissim or Aimsun, and open-source software such as SUMO. The right level of detail depends on the question to be answered.

Data collection

  • Traffic counts: manual, video, radar, inductive loops or ANPR, classified by vehicle type.
  • Origin-destination surveys and ANPR-based matching to learn where traffic comes from and goes to.
  • Travel-time measurements and queue observations.
  • Counts of pedestrians, cyclists and public transport passengers where relevant.

Calibration and validation

A model is only useful if it reproduces observed reality. During calibration, parameters are adjusted until modelled flows, travel times and queues match the measurements; validation then checks the model against independent data. Recognised criteria, such as the GEH statistic for traffic flows, make the quality of the model transparent.

Typical questions a model answers

  • Does a junction work better as a roundabout or with traffic signals?
  • What happens to traffic in the surrounding streets when a new circulation plan or school street is introduced?
  • How should traffic be diverted during roadworks or an event?
  • Which signal timings or coordination give the best result on a corridor?
  • What is the effect of public transport priority on general traffic?

Presenting results

A model is a means, not an end. Results are presented as clear comparisons between scenarios — travel times, queue lengths, delays per mode, levels of service — together with the assumptions and limitations of the model. Animations of microscopic simulations are often the most effective way to explain a proposal to decision-makers and residents.

How Urbiflow helps

We plan and carry out traffic counts and surveys, build and calibrate strategic and microscopic models, test scenarios and report the results clearly. Because our modellers work alongside design and integration engineers, recommendations stay technically feasible.

Relevant for: Cities & municipalitiesRoad & highway authorities

FAQ

Frequently asked questions

What is the difference between a traffic study and a traffic model?

A traffic study collects and analyses data about the current situation, for example counts and travel times. A traffic model uses that data to simulate the network and to compare future scenarios.

Which modelling software do you use?

We choose the tool that fits the question and the client: commercial packages such as PTV Visum, Vissim or Aimsun, or open-source software such as SUMO. Models can be delivered so that the client can reuse them.

How long does a traffic model take?

A junction study can take a few weeks, a calibrated network model several months. Data collection, which depends on seasons and school holidays, is often the critical path.

Let's discuss your project

Our international teams are ready to help.