Owner's engineering

Your owner's engineer for ITS projects

As your owner's engineer we work on your side only — from the first study to the specifications, the evaluation of the bids, the supervision of the works, acceptance and the monitoring of maintenance performance.

Discuss an owner's-engineer mission Brochure (PDF)

What we do for you

Engage us for the whole project or for a single phase.

  1. 1

    Studies

    Traffic studies, counts, modelling and feasibility studies, and signal designs in Cadence.

  2. 2

    Specifications

    Functional, brand-neutral technical specifications based on open standards, test plans and price schedules for your tender documents.

  3. 3

    Bid evaluation

    Answers to bidders' questions, technical and financial evaluation of the offers and a substantiated award recommendation.

  4. 4

    Works supervision

    Review of the contractor's designs and documents, supervision on site, factory tests and progress and quality reports.

  5. 5

    Acceptance

    Site acceptance tests against the test plan, lists of reservations, and provisional and final acceptance on your behalf.

  6. 6

    Maintenance performance

    Independent monitoring of the maintenance contract: availability, response and repair times, SLA reports and penalties.

A typical ITS project, phase by phase

Where Urbiflow can take part, and in which role. On one project we take only one of the two roles.

  1. 1Needs and feasibilityYou define the need, the objectives and the budget.
    Owner's engineer: Studies, counts and modelling, feasibility, designs in Cadence
    Integrator: No role in this phase
  2. 2Market consultation (RFI)You ask the market for information.
    Owner's engineer: Preparation of the RFI and analysis of the answers
    Integrator: Answer your RFI with technical and market information
  3. 3Specifications and tender documentsYou prepare the call for tenders.
    Owner's engineer: Brand-neutral specifications, test plans, price schedule
    Integrator: No role in this phase
  4. 4Call for tenders, evaluation and award (RFQ)You receive, compare and award the offers.
    Owner's engineer: Answers to bidders' questions, bid evaluation, award recommendation
    Integrator: Submit an offer
  5. 5ExecutionDesign, supply, installation and integration of the system.
    Owner's engineer: Review of the contractor's designs, site supervision, factory tests (FAT)
    Integrator: Detailed design, multi-vendor supply, installation and integration
  6. 6Testing and acceptanceYou take over the installation.
    Owner's engineer: Site acceptance tests (SAT), provisional and final acceptance on your behalf
    Integrator: Testing, commissioning and handover
  7. 7Operation and maintenanceThe system is operated and maintained.
    Owner's engineer: Monitoring of maintenance performance and SLAs
    Integrator: Preventive and corrective maintenance under SLA
One project, one role

If we work for you as owner's engineer — even only for the studies or the specifications — we do not bid, deliver or maintain on that project. If we deliver the system, we are not the owner's engineer of that project.

Phase by phase: what we can do for you

In every phase we can do the work ourselves, or find and steer the right partner for you — always on your side.

1

Needs and feasibility

Before anything is specified, the need must be clear: what problem, where, with which objectives and budget.

We do it ourselves

  • Traffic counts and surveys, travel-time and queue measurements
  • Strategic and microscopic traffic models to compare scenarios
  • Feasibility study with options, costs and risks
  • Preliminary designs and signal plans in Cadence, traceable to the standard
  • 3D visualisation and simulation of the future situation for councils and residents

Or we find and steer the right partner

If the project needs specialised studies outside ITS — for example environmental, geotechnical or a city-wide mobility plan — or if you prefer a local bureau, we write the study brief, help you select the right partner, steer the study and review the results for you.

What you receive: Feasibility report, traffic model, preliminary designs and 3D visualisations

3D simulation in Cadence: the future intersection with trams, cyclists and pedestrians, as residents and councils will see it.
3D simulation in Cadence: the future intersection with trams, cyclists and pedestrians, as residents and councils will see it.
The same design seen from above, with the surrounding buildings.
The same design seen from above, with the surrounding buildings.
Microsimulation in the browser: queues, detectors and road users responding to the signal plan.
Microsimulation in the browser: queues, detectors and road users responding to the signal plan.
Plan view on the official base map, with signal heads and detectors.
Plan view on the official base map, with signal heads and detectors.
2

Market consultation (RFI)

A market consultation shows what the market can offer before the specifications are fixed.

We do it ourselves

  • Questionnaire and technical questions for the market
  • List of suppliers and manufacturers to consult — several brands, no preference
  • Analysis of the answers: technologies, maturity, indicative prices and lead times
  • Market overview and budget estimate for the business case

Or we find and steer the right partner

For very specialised equipment we can involve independent experts or test laboratories, for example to assess the accuracy of weigh-in-motion sensors.

What you receive: RFI document, market overview and budget estimate

3

Specifications and tender documents

The specifications decide what you will get — and whether every qualified supplier can compete.

We do it ourselves

  • Functional, brand-neutral technical specifications based on open standards
  • Signal plans and designs from Cadence to include in the tender
  • Test plans for the factory and site acceptance tests (FAT/SAT)
  • Price schedule, quantities, selection and award criteria
  • Maintenance requirements and service levels (SLA) for the operation phase

Or we find and steer the right partner

For the parts outside ITS — civil works, electrical connections, road layout — we coordinate with your design engineer or help you select one, so that the tender documents form one coherent whole.

What you receive: Technical specifications, test plans, price schedule and award criteria

Signal-plan diagram, ready to include in the tender documents.
Signal-plan diagram, ready to include in the tender documents.
Phase diagram with a capacity check per peak period.
Phase diagram with a capacity check per peak period.
4

Tender, evaluation and award (RFQ)

During the tender we support your team so that the best offer wins on clear, documented grounds.

We do it ourselves

  • Answers to bidders' questions and site visits
  • Compliance check of each offer against the specifications
  • Technical and financial evaluation according to the award criteria
  • Clarification meetings and, where the procedure allows, negotiation support
  • Evaluation report with a substantiated award recommendation

Or we find and steer the right partner

Where a legal or procurement specialist is needed, we work alongside your legal advisor. The award decision always remains yours.

What you receive: Evaluation report and award recommendation

5

Execution

Once the contract is signed, we watch over quality, planning and compliance for you.

We do it ourselves

  • Review of the contractor's designs and documents — signal plans and intergreen times can be checked in Cadence
  • Factory acceptance tests (FAT) of the equipment
  • Supervision of the works on site, with progress and quality reports
  • Assessment of change requests and their impact on cost and planning
  • A local assistant close to the site for visits, photos and measurements at our request

Or we find and steer the right partner

For long or remote sites we can work with a local supervision firm under our coordination, so that you keep one point of contact.

What you receive: Review notes, site and FAT reports, progress reports

Conflict matrix: every intergreen time can be traced to its formula — useful to check a contractor's design.
Conflict matrix: every intergreen time can be traced to its formula — useful to check a contractor's design.
6

Testing and acceptance

Acceptance is the moment to make sure you get what was specified.

We do it ourselves

  • Site acceptance tests (SAT) against the test plan
  • List of reservations and follow-up until they are resolved
  • Check of the as-built documents, manuals and training
  • Provisional and final acceptance on your behalf

Or we find and steer the right partner

For measurements that need certified equipment — for example the calibration of weigh-in-motion or speed-enforcement systems — we involve an accredited laboratory and check its results.

What you receive: SAT reports, list of reservations and acceptance files

7

Operation and maintenance

After acceptance the system has to keep performing. We monitor the maintenance contractor for you.

We do it ourselves

  • KPIs and reporting for availability, response and repair times
  • Check of the maintenance contractor's SLA reports and calculation of penalties or bonuses
  • Periodic audits of the installations
  • Recommendations for improvements and for the renewal of the maintenance contract

Or we find and steer the right partner

If you need a new maintenance contractor, we prepare the tender for it — and, as always, we do not bid for it ourselves.

What you receive: SLA reports, audit reports and an improvement plan

Our independence charter

  • One project, one role
    Owner's engineer or integrator, never both on the same project — maintenance included.
  • No preferred brand
    We work with equipment from several manufacturers. Our specifications are functional and based on open standards such as DATEX II, NTCIP, OCIT, UTMC and OCPI, so that every qualified supplier can compete.
  • Paid by you only
    In an owner's-engineer mission we accept no fee, commission or other advantage from suppliers, contractors or manufacturers.
  • Relationships declared
    Before a mission starts we declare any business relationship with a potential bidder.
  • Our tools are never a requirement
    We may use our own software, such as Cadence, to design and review; bidders are never required to use it.

Cadence for owners

In studies and when checking a contractor's signal design we can use Cadence, our traffic-signal design software: every calculated value can be traced to its formula and source, and your team can review the design in the browser. Bidders are never required to use it.

Cadence

Close to your project

For projects abroad our engineers work with a local assistant close to the site, who carries out site visits, checks, photos and measurements at their request.

FAQ

Frequently asked questions about owner's engineering

What is an owner's engineer?

An independent advisor who represents the client during a project — from the first studies to acceptance and maintenance — without supplying or building anything on it.

Can you be our owner's engineer and also deliver the system?

No. On one project we take one role only. If we are your owner's engineer — even only for the studies or the specifications — we do not bid, deliver or maintain on that project.

Can we hire you for one phase only?

Yes. You can engage us for a single phase, for example only the studies or the specifications, or for the whole project from study to maintenance.

Do bidders have to use particular brands or Cadence?

No. Our specifications are functional and brand-neutral, and Cadence is only our working tool.

Let's discuss your project

Our international teams are ready to help.